Clients

Description of Work

Completions Date

A.H Al –Zamil Group of Companies, Dammam

  • Installation, Testing & Commissioning of SF6 insulated switch-gear.
  • Hi-pot test on H.T cables.
  • Laying, Cutting, Crimping and Terminating the H.T cables to the switch-gear and Transformer.
December 1995

Arab Paper Manufacturing Co. Ltd. Dammam

  • Laying, Testing, Cutting, Crimping and Terminating the H.T. cables
  • Testing & Commissioning of SF6 insulated switch-gear and 1000KVA Transformer
April 1996

National Medical Services Co. Dammam

  • Disconnection of the old panel, installation of the new Main Distribution Panel at other location and related cabling.
June 1996

Al-Jabar Co. Dammam

  • Casting of concrete foundation for the Panel Board.
  • Installation, Testing & Commissioning of the Main Distribution Panel and Sub-Distribution Panel Boards.
  • Laying & termination of L.V. cables.
  • Grounding system
October 1996

Al-Ettifaq Steel Factory, Dammam

  • Installation, Testing & Commissioning of the MV switch-gear and 1500KVA Transformer.
  • Hi-pot test on H.T cables.
  • Foundation for Transformers.
  • Installation of 1500KVA Transformers.
  • M.V. and L.V. cable laying & termination.
January 1997

Aujan Soft Drinks Industries , Dammam

  • Installation, Testing and Commissioning of SF6 insulated switch-gear and Two 1000KVA Transformers.
  • Hi-pot test on H.T. cables.
  • Cutting, Crimping and Terminating the H.T. cables to the switch-gear, feeders and Transformer.
  • Relay setting of the switch-gear for over current protection and earth fault current.
  • L.V. Equipment.
  • Installation of cable tray inside the factory.
  • Lying of L.T. cables on the cable tray.
  • Installation, Testing and Commissioning of the Main Distribution Panel.
October 1997

Al-Gaswa Support Co. Ltd. – Jubail Industrial City, -Under Royal Commission Supervision

  • Installation, Testing and Commissioning of 34.5KV, Switch-gear with separate Transformer feeder unit.
  • Installation, Testing and Commissioning of 1500KVA power Transformers.
  • Installation, Testing and Commissioning of the Main Distribution Panel.
  • Installation of 10 Nos. Distribution Panels.
  • Laying & terminating M.V. & L.V. cables.
  • Installation, Testing and Commissioning of 432KVA, 400V, stand by Diesel Generator with Automatic Transformer Switch.
  • Installation of cable tray throughout the factory and giving electrical supply to the various machines.
  • Installation of lighting fixtures inside and outside the factory.
November 1998

Saudi New Zealand Milk Co. Ltd. Dammam.

  • Installation, Testing & Commissioning of Main Panel Board
  • Excavation of trench.
  • Laying, Cutting, Crimping and Terminating the cables between SCECO Substation and the Main Panel Board.
January 1999

Batook Chewing Gum. Industrial Ltd. Dammm

  • Excavation of trench from SCECO Sub-station to the Transformer Room.
  • Laying of cables in the trench, back filling and re-instatement.
  • Installation, Testing & Commissioning of Distribution Panel Board.
March 1999

Al -Mutlaq Servicing & Manufacturing Co. Dammam.

  • Construction of SCECO Sub-station Room as per SCECO East Standard.
  • Installation, Testing & Commissioning of M.V switchgear, 1000 KVA and 500KVA Transformers, Main Distribution Board, Sub Distribution Board etc.
  • Trenching, cable laying, reinstatement works, including splicing and Termination for H.T / L.T cable networks up to 13.8KV.
  • Installation of cable tray, laying the cable between MDP to each Machines on cable tray and terminating the cables to the machines.
May 1999

Hayat Plaza Marketing Complex. Dammam.

  • Installation Testing & Commissioning of R.M.U, 1000KVA Transformer and Main Distribution Panel.
  • Laying and terminating of M.V and L.V cables.
May 1999

Al-Mouwasat Trading & Contracting Est. Al-Jubail.Hai Al-Fanatir, under the Royal commission supervision

  • Installation, Testing & Commissioning of Ring Main Units, 2 Nos. SCECO East Unit Sub-station consisting of Two Transformers L.V panel with fuse switches.
  • Cable laying and termination for H.T/ L.T cables.
  • Grounding system for H.V / L.V involved equpments.
  • Installation 600A of 299 Nos. Main Circuit Breakers and KWH Meter, SCECO specification in the residential colony, the work includes trenching, cable laying reinstatement, splicing and diverting the cables from existing breakers to the newly installed breakers and KWH Meters. Foundation of steel structure for installation of KWH meters and concrete foundation for all the steel structures (299 Nos.)
June 1999

Aujan Soft Drinks Industries. Dammam. 2nd Power Up-gradation for the new plant expansion.

  • Up-gradation of electrical power:-
  • Transportation Installation, Testing & Commissioning of 2000KVA Transformer & Main Distribution Panel.
  • Relocation of existing Distribution Transformer and MDP.
  • Foundation for steel structure.
  • Construction of two stores steel structure to accommodate Main Distribution Panels & power factor correction panels in available space.
  • Provision of Air conditioner Power factor correction panel Room.
  • Installation, Testing and Commissioning of new M.V Switchgear and coupling with the existing M.V switchgear.
  • Installation of cable tray, laying the cables on cable tray between each machine and MDP, terminating the cable to each and every installed Machines.
  • Trenching, cable laying, reinstatement work for diverting the existing as well as the new cables.
June 1999

Al-Khadi Tent Factory

  • Foundation for Main Panel.
  • Supply, Installation & termination of outgoing & in-coming cables of the M.D.P.
June 1999

A.A. Turki Corporation (ATCO) Sunset Beach Resort. Al-Khobar.Tele: 8332339, 8656160

  • Installation, testing & commissioning of Merlin Gerin make Medium Voltage switchgears. Total connected load 20MVA (20 Transformer – each 1000 kVA). Load shedding with the help of PLC controlled arrangement.
  • Installation of battery charger, battery back up stand by Generator of 1000KVA capacity with automatic changeover switch.
  • Installation of transformers, M.V cable laying, Hi-pot testing, L.V cable laying and termination etc. & Earthing resisting test.
July 1999

 