TX Nefario - шаблон joomla Форекс

 

Client

Description of Work

Completions Date

NABISCO Factory, Dammam. Al-Olayan Group of Companies

  • Installation of Main Distribution Panel, Sub Distribution panels, bus bar systems and L.V. side wiring.
August 1992

Saudi Public Transportation Co. (SAPTCO) Dammam.

  • Supply and installation of cables for rerouting of the Main Panel and some repairs job.
October 1992

A.F. Al-Kraidees Est.New Ford Car Showroom Tawkilat Al-Jazira Dammam.

  • Construction of Unit substation.
  • Installation of Transformer, Distribution Panels, Supply and laying of all L.V. cables, grounding system etc.
November 1992

Sahara- Building Contractors Khobar.-For Saudi Milk Co. SADAFCO

  • Testing, commissioning, relay setting for M.V switch-gear, Hi-Pot testing.
December 1992

Al-Shamrani Factory.

  • Installation, commissioning, relay setting, Hi-pot testing for M.V switch-gears & cables.
  • Installation of 1500kVA Transformers and Ring Main Units.
  • Grounding system.
June 1993

Bitumat Co. Ltd. Dammam

  • Testing & Commissioning of the Ring Main Units, SF6 Gas insulated switch-gears and 1000KVA Transformers.
  • Di- electric test for Transformer Oil
August 1993

Al Maha Trading Est. Dammam

  • Installation, Testing & Commissioning of Auto Transformer.
  • Installation of the Main Distribution Panel Board and related cabling, connection of the Main Single Core Cable to SCECO Transformer.
November 1993

SIPCO (Saudi Industries Pain Co.) Dammam

  • Construction of the SCECO Sub-station.
  • Concrete foundation for the Panel Boards.
  • Installation, Testing & Commissioning of Panel Boards with 800A Main Breaker and related wiring.
March 1994

Al-Mutlaq Furniture Manufacturing Co. Ltd. Dammam.

  • Construction of the SCECO Substation
  • Installation, Testing & Commissioning of the Main Distribution Panel and related wiring.
June 1994

Al-Andalus Wedding Hall Dammam.

  • Installation, Testing & Commissioning of the Main Distribution Panel & related cabling between customer & SCECO side.
September 1994

Al-Kadi Tent Factory, Dammam

  • Casting of concrete foundation for the Main Distribution Panel.
  • Installation, Testing & Commissioning of the Main Distribution Panel.
  • Cutting, Crimping and Terminating the incoming as well as outgoing cable to the Main Distribution Panel & connection of cable at SCECO substation.
December 1994

AL-Hayath Plaza

  • Erection & commissioning of H.V. Equipment.
  • Relay setting, Hi-pot test & Ground resistance test.
  • Internal Distribution net work of 17 Sub-Station.
  • Total load of 18 M.V.A
February 1995

Abbar & Zani Cold Stores

  • Installation, Testing & Commissioning of M.V. Switch-gear and Ring Main Unit and 1600KVA Transformer .
  • Hi-pot test on H.T cables
  • Laying & terminating of the M.V. and L.V. cables.
March 1995

Khalifa Al-Gosaibi Group of Companies, Dammam.

  • Laying of cables & terminations in SCECO Sub-Station and Main Circuit Breaker.
April 1995

Al-Muhaidib Trading & Contracting Co Dammam.

  • Installation, Testing & Commissioning of Ring Main Unit, SF6 Gas insulated switch-gear & 1000KVA Transformer.
  • Hi-pot test on H.T cables.
  • Laying, Cutting, Crimping and Terminating the H.T cables to the RMU switch-gear & Transformer.
  • LLaying, Cutting and Crimping the L.T. cable to the secondary side of the Transformer.
November 199

 


 

Clients

Description of Work

Completions Date

A.H Al –Zamil Group of Companies, Dammam

  • Installation, Testing & Commissioning of SF6 insulated switch-gear.
  • Hi-pot test on H.T cables.
  • Laying, Cutting, Crimping and Terminating the H.T cables to the switch-gear and Transformer.
December 1995

Arab Paper Manufacturing Co. Ltd. Dammam

  • Laying, Testing, Cutting, Crimping and Terminating the H.T. cables
  • Testing & Commissioning of SF6 insulated switch-gear and 1000KVA Transformer
April 1996

National Medical Services Co. Dammam

  • Disconnection of the old panel, installation of the new Main Distribution Panel at other location and related cabling.
June 1996

Al-Jabar Co. Dammam

  • Casting of concrete foundation for the Panel Board.
  • Installation, Testing & Commissioning of the Main Distribution Panel and Sub-Distribution Panel Boards.
  • Laying & termination of L.V. cables.
  • Grounding system
October 1996

Al-Ettifaq Steel Factory, Dammam

  • Installation, Testing & Commissioning of the MV switch-gear and 1500KVA Transformer.
  • Hi-pot test on H.T cables.
  • Foundation for Transformers.
  • Installation of 1500KVA Transformers.
  • M.V. and L.V. cable laying & termination.
January 1997

Aujan Soft Drinks Industries , Dammam

  • Installation, Testing and Commissioning of SF6 insulated switch-gear and Two 1000KVA Transformers.
  • Hi-pot test on H.T. cables.
  • Cutting, Crimping and Terminating the H.T. cables to the switch-gear, feeders and Transformer.
  • Relay setting of the switch-gear for over current protection and earth fault current.
  • L.V. Equipment.
  • Installation of cable tray inside the factory.
  • Lying of L.T. cables on the cable tray.
  • Installation, Testing and Commissioning of the Main Distribution Panel.
October 1997

Al-Gaswa Support Co. Ltd. – Jubail Industrial City, -Under Royal Commission Supervision

  • Installation, Testing and Commissioning of 34.5KV, Switch-gear with separate Transformer feeder unit.
  • Installation, Testing and Commissioning of 1500KVA power Transformers.
  • Installation, Testing and Commissioning of the Main Distribution Panel.
  • Installation of 10 Nos. Distribution Panels.
  • Laying & terminating M.V. & L.V. cables.
  • Installation, Testing and Commissioning of 432KVA, 400V, stand by Diesel Generator with Automatic Transformer Switch.
  • Installation of cable tray throughout the factory and giving electrical supply to the various machines.
  • Installation of lighting fixtures inside and outside the factory.
November 1998

Saudi New Zealand Milk Co. Ltd. Dammam.

  • Installation, Testing & Commissioning of Main Panel Board
  • Excavation of trench.
  • Laying, Cutting, Crimping and Terminating the cables between SCECO Substation and the Main Panel Board.
January 1999

Batook Chewing Gum. Industrial Ltd. Dammm

  • Excavation of trench from SCECO Sub-station to the Transformer Room.
  • Laying of cables in the trench, back filling and re-instatement.
  • Installation, Testing & Commissioning of Distribution Panel Board.
March 1999

Al -Mutlaq Servicing & Manufacturing Co. Dammam.

  • Construction of SCECO Sub-station Room as per SCECO East Standard.
  • Installation, Testing & Commissioning of M.V switchgear, 1000 KVA and 500KVA Transformers, Main Distribution Board, Sub Distribution Board etc.
  • Trenching, cable laying, reinstatement works, including splicing and Termination for H.T / L.T cable networks up to 13.8KV.
  • Installation of cable tray, laying the cable between MDP to each Machines on cable tray and terminating the cables to the machines.
May 1999

Hayat Plaza Marketing Complex. Dammam.

  • Installation Testing & Commissioning of R.M.U, 1000KVA Transformer and Main Distribution Panel.
  • Laying and terminating of M.V and L.V cables.
May 1999

Al-Mouwasat Trading & Contracting Est. Al-Jubail.Hai Al-Fanatir, under the Royal commission supervision

  • Installation, Testing & Commissioning of Ring Main Units, 2 Nos. SCECO East Unit Sub-station consisting of Two Transformers L.V panel with fuse switches.
  • Cable laying and termination for H.T/ L.T cables.
  • Grounding system for H.V / L.V involved equpments.
  • Installation 600A of 299 Nos. Main Circuit Breakers and KWH Meter, SCECO specification in the residential colony, the work includes trenching, cable laying reinstatement, splicing and diverting the cables from existing breakers to the newly installed breakers and KWH Meters. Foundation of steel structure for installation of KWH meters and concrete foundation for all the steel structures (299 Nos.)
June 1999

Aujan Soft Drinks Industries. Dammam. 2nd Power Up-gradation for the new plant expansion.

  • Up-gradation of electrical power:-
  • Transportation Installation, Testing & Commissioning of 2000KVA Transformer & Main Distribution Panel.
  • Relocation of existing Distribution Transformer and MDP.
  • Foundation for steel structure.
  • Construction of two stores steel structure to accommodate Main Distribution Panels & power factor correction panels in available space.
  • Provision of Air conditioner Power factor correction panel Room.
  • Installation, Testing and Commissioning of new M.V Switchgear and coupling with the existing M.V switchgear.
  • Installation of cable tray, laying the cables on cable tray between each machine and MDP, terminating the cable to each and every installed Machines.
  • Trenching, cable laying, reinstatement work for diverting the existing as well as the new cables.
June 1999

Al-Khadi Tent Factory

  • Foundation for Main Panel.
  • Supply, Installation & termination of outgoing & in-coming cables of the M.D.P.
June 1999

A.A. Turki Corporation (ATCO) Sunset Beach Resort. Al-Khobar.Tele: 8332339, 8656160

  • Installation, testing & commissioning of Merlin Gerin make Medium Voltage switchgears. Total connected load 20MVA (20 Transformer – each 1000 kVA). Load shedding with the help of PLC controlled arrangement.
  • Installation of battery charger, battery back up stand by Generator of 1000KVA capacity with automatic changeover switch.
  • Installation of transformers, M.V cable laying, Hi-pot testing, L.V cable laying and termination etc. & Earthing resisting test.
July 1999

 


 

Client

Description of Work

Completions Date

E.A Juffali & Brothers (Mercedes Benz New Car Workshop)

  • Installation, testing & commissioning of M.V switchgear.
  • Relay testing & testing.
  • M.V cable terminations.
  • Grounding system.
  • Diverting of the existing M.V cable to the new network of the workshop.
October 1999

Zahir Gazawi Factory, Dallah Area dammam

  • Wiring for Up-gradation of the electrical system.
October 1999

ATCO

  • Al-Guraya SCECO power plant in Hassa area M.V cable splicing on existing cable trays.
December 1999

Olayan Kimberly 1st Industrial City

  • Supply and installation of KWH Meter
January 2000

Bedoun Essem M.A.H Group of Companies

  • Supply and Installation of the Main Breaker near sub-station, Distribution board in work place installation of cable ladders laying & termination of cables.
January 2000

Maternity Hospital

  • Supply, Installation and testing of changeover switch & related wiring for making provision to take supply from SCECO trolley mounted Generated Set.
February 2000

Binzagar wall’s Co. Ltd.

  • M.V Relay setting and testing of their Main in-comer switchgear.
February 2000

G.C.D (Australian Company)

  • Installation of control panels, cable trays & ladders.
  • Supply and installation of power & control cables and total field wiring and connections for control system using Rockwell Automation designed DCS for Arabian Fiber Glass Insulation Company Up-Gradation project.
June 2000

SORG (German Company)

  • Casting of concrete foundation for the Panel Board.
  • Installation, Testing & Commissioning of the Main Distribution Panel and Sub-Distribution Panel Boards.
  • Laying & termination of L.V. cables.
  • Grounding system
June 2000

AMERON Saudi Arabia Ltd. AMIANTIT Group of Companies.

  • Supply and installation of step up Transformer, Isolators, Changeover switch and complete wiring to feed equipment of rating 480V using SCECO 380V supply.
October 2000

Aujan soft Drink Indus. Dammam.

  • Modification of existing M.V switchgear Room to add two switchgears for two new Transformers of 2 MVA Capacity.
  • Installation of M.V switchgear near Transformer.
  • Installation of 2 MVA Transformers –2 Nos.
  • Installation of Main Distribution Panel.
  • Installation of two Capacitor Panels for power factor correction.
  • Constructions of two stories steel structure room for the new capacitor panels.
October 2000

Al-Mutlaq compound.

  • Replacement of overhead cables by under ground cables, shifting of Panels, KWH meters, mini-pillars etc.
March 2001

National Pipe Company (NPC)

  • Total electrical & piping work for their expansion project. Includes M.V. & L.V. cable laying more than 1500 Mtrs, installation of transformers Distribution Panels etc. Piping for Drinking water, Raw water and Sewage water lines.
April 2001

Al-Grinees Cold Storage

  • Complete wiring of their new cold storage. Installation of cable trays, panels A/Cs etc.
May 2001

SAPIN – Saudi Arabian Packaging Industry

  • Modification for electrical supply system.
May 2001

 


 

Client

Description of Work

Completions Date

Saudi American Bank Ware House

  • Construction of Unit Sub Station
May 2001

AHG Gas Company

  • Construction of Unit Sub Station
May 2001

Saudi German Company

  • Repairing of M.V. protection relay and setting as per SCECO requirement.
June 2001

Al-Mutlaq compound

  • Shifting of KWH meters, converting over head line supply to underground cables.
August 2001

Honda New Showroom

  • Trench work and laying of PVC Pipes.
August 2001

Al-Kuhaimi Metals

  • Up-gradation project addition of 2 MVA transformer. Changing SEC low voltage sub-station to medium voltage sub station. Shifting of existing panels, installation of new panels, cable trays, laying & termination of cable etc.
October 2001

Olayan Kimberly Clark

  • Up-gradation project. Construction of new M.V. substation, necessary changes and additions in M.V. switch-gear – installation of Transformer, R.M.Us, Panels etc.
October 2001

Al-Hajri

  • Electrical Up-gradation project
October 2000

Al-Arfaj

  • Construction of inset sub-station & laying / terminating M.V. cable, supply & installation of M.V. switchgear
October 2001

National Pipe Company – Old Abquaq Road

  • Outside lighting arrangement
August 2001

Al-Hajri

  • Electrical system up-gradation.
October 2001

Khalid Marble Company in 1st Industrial City

  • Construction of unit sub-station
November 2001

Al-jazira Jewelry Factory

  • Electrical up-gradation work.
November 2001

Eastern Insulation Company – in 1st Industrial City.

  • Construction of inset sub-station.
  • Electrical Distribution System.
  • Supply & installation of Panel Boards.
December 2001

Eastern Insulation Company – in 1st Industrial City.

  • Construction of inset sub-station.
  • Electrical Distribution System.
  • Supply & installation of Panel Boards.
December 2001

 


 

Client

Description of Work

Completions Date

Al-Mintakh Modern Factory for Sweets & Pastries in 2nd Industrial City.

  • Construction of unit substation.
  • Construction of concrete foundation for transformer & R.M.U.
  • Installation of breaker.
  • Supplying, laying and terminating of cables.
March 2002

Perfume shop In Dammam Center

  • Electrical work.
May 2002

Mr. Mansoor

  • Villa Total Electrical Work.
May 2002

Saudi Arabian Packaging Industry – SAPIN

  • Supply and installation of cable tray.
  • Supply, laying and terminating of cable.
May 2002

Saudi Arabian Industrial & Trading Est. (SAITE)

  • SOER Equipment Installation & field wiring in SWCC control room.
  • Installation of panel
September 2002

Khalid Al Obaidan

  • Villa Electrical work
November 2002

Mr. Jamal shareef

  • Villa Electrical Work
December 2002

Olayan Kimberly- Clark Saudi Arabia – (Phase –II)

  • Supply and installation of Distribution panel.
  • Supply, laying and terminating of cable.
  • Supply and installation of cable ladder / tray.
December 2002

MFSI

  • Installation work for machines.
December 2002

Al-Qureshi Constructions.

  • Electrical system up-gradation for Gulf Chemicals & Industrial resigns (Additional power 1000kVA).
December 2002

United Business System

  • Electrification of new industrial shed.
June 2003

Al-Azzaz

  • Substation civil work.
July 2003

Olayan Kimberly Clark Saudi Arabia – (Phase III)

  • Electrical System up-gradation
August 2003

AMERON Saudi Arabia Ltd. AMIANTIT Group of Companies.

  • Electrical system up-gradation (1500 kVA additional power)
December 2003

Thanhat Mining Co.

  • Supply arrangement of new machines.
  • Related cable work for above work
January 2004

 


 

Client

Description of Work

Completions Date

COMPACT – NAPCO

  • Installation of Distribution panel.
  • Laying and terminating of cable.
  • Installation of cable ladder / tray
January 2004

Olayan Kimberly Clark Saudi Arabia – (Phase IV)

  • Electrical System up-gradation
January 2004

Al-Minthak Factroy for Sweets & Pastries.

  • Electrical Up-Gradation Project (addition of 3000 KVA).
February 2004

Al Hussaini

  • Villa Electrical works
March 2004

Arabian Paper Product Co. (APPCO)

  • Electrical System up-gradation
Electrical System up-gradation

Al-Gosaibi

  • Installation of additional KWH meter
April - 2004

ATCO - Al-Faris Commercial building

  • Five story building full Electrical system.
April 2005

Al-Yammama

  • Port housing project - Supply & installation of switchgear, package units, lighting poles & fixtures and M. V. & L. V. cables supply, laying & termination.
May 2005

Al-Jazira (Qahtani Pipe group)

  • Wiring for new office building..
May 2005

Al-Oula Tower

  • Electrical works for new tower
July 2005

Amiantit Rubber

  • Electrical works for additional power.
July 2005

Olayan Kimberly Clark Saudi Arabia – (Phase IV)

  • Electrical System up-gradation
July 2005

Al-Minthak Factroy for Sweets & Pastries.

  • Electrical Up-Gradation Project (addition of 3000 KVA).
July 2005

Al Hussaini

  • Villa Electrical works
August 2005

Arabian Paper Product Co. (APPCO)

  • Electrical System up-gradation
September 2005

 


 

Client

Description of Work

Completions Date

Al-Gosaibi

  • Installation of additional KWH meter
September 2005

ATCO - Al-Faris Commercial building

  • Five story building full Electrical system.
September 2005

Al-Yammama

  • Port housing project - Supply & installation of switchgear, package units, lighting poles & fixtures and M. V. & L. V. cables supply, laying & termination.
October 2005

Al-Jazira (Qahtani Pipe group)

  • Wiring for new office building.
October 2005

Al-Jazira (Qahtani Pipe group)

  • Wiring for new office building.
October 2005

Al-Oula Tower

  • Electrical works for new tower
October 2005

Amiantit Rubber

  • Electrical works for additional power.
November 2005

Al-Yammama Extension of phase II

  • Port housing project - Supply & installation of switchgear, package units, lighting poles & fixtures and M. V. & L. V. cables supply, laying & terminations.
November 2005

Heba Fire & Safety Co.

  • Arrangement for additional power – Civil & electrical works. (Expansion Project)
December 2005

NDT Technology Center

  • Electrical work for new factory
December 2005

Al-Mathrood

  • Installation of Kwh Meters.
January 2006

Al- Usaimi Factory for Industrial Steel

  • Electrical works for new rolling mill.
January 2006

Bonstrand (Amiantit group)

  • New M.V. setup to accommodate extra requirement of power.
March 2006

Saudi Arabian Ductile Iron Pipe Co. SADIP(Amiantit group)

  • Lighting and power socket arrangement for three new production sheds.
May 2006

ATCO - Sheraton renovation

  • Total electrical works for the renovation.
July -2006

 


 

Client

Description of Work

Completions Date

Fast Contracting Co.

  • Electrical works at College of Medicine & Pharmacy for King Faisal University at Al-Hasa
September 2006

Heba Fire Fighting Equipment

  • Electrical & Piping work for new production line.
October 2006

Cathodic Protection Systems Factory ALUPCO Group

  • Total electrical, Fire Alarm System, Telephone system works
  • Total electrical wiring for the furnaces, machines and factory equipment.
December 2006

Al Qahtani Car Show room Al Qahatani Group

  • Total electrical works for new Car Showroom.
January 2007

Qutif City Mall Phase one

  • Installation of panels, L. V. cables laying & terminations.
February 2007

Olayan Kimberly clark.

  • Complete electrical work for new machines
February 2007

ATCO -

  • Electrical works for Data, Telephone and Power system at Prince Moh’d Bin Fahad University
March 2007

Group Five Saudi Pipe Co. Al Qahatani Group

  • Construction of Sub-station and Electrical Room for total load of 4 MVAInside electrical works for shed No 3 & 4.
April 2007

Fast Contracting Co.

  • Electrical works at College of Medicine & Pharmacy for King Faisal University at Al-Hasa
April 2007

Gulf Chemicals

  • Arrangement for connecting Generators
May 2007

Cathodic Protection Systems Factory ALUPCO Group

  • Total electrical, Fire Alarm System, Telephone system works
  • Total electrical wiring for the furnaces, machines and factory equipment.
June 2007

Olayan Kimberly clark.

  • Complete electrical work for new machines
July 2007

Qutif City Mall

  • Installation of panels, L. V. cables laying & terminations.
July 2007

ATCO -

  • Electrical works for Data, Telephone and Power system at Prince Moh’d Bin Fahad University
July 2007

Group Five Saudi Pipe Co. Al Qahatani Group

  • Construction of Sub-station and Electrical Room for total load of 4 MVA
  • Inside electrical works for shed No 3 & 4.
July 2007

 


 

Client

Description of Work

Completions Date

Al Rushaid for Cameron

  • Electrical Installation work.
August 2007

Al-Rushaid for Oill Well

  • Electrical Installation
August 2007

Arabian Company for Water Pipes Industry Ltd.

  • Assisting for Machine Installation.
June 2010

Saudi Seamless Pipes (Zamil)

  • Working with Canadian Engineers for Electrical & Instrumentation works.
August 2010

Saber Glass Factory

  • Up gradation from 2000 KVA to 3500 KVA
August 2010

Al-Othman Pole Factory

  • Power Distribution for Total Factory
September 2010

King Faisal University Al-Hassa

  • Upgrading of College & Universities.
  • Replacement of Panels & lighting Fixtures.
September 2010

Industrial Valve Manufacturers.

  • Total Electrical Works for their ware house
October 2010

Bondstrand Amiantit Group

  • Additional of M.V. & L.V. Equipment to upgrade the system from 1500KVA to 2500 KVA.
October 2010

Lagoon Mall

  • Distribution system for total 4000KVA loads for 3 building.
December 2010

Al-Iman

  • Lights Installation for Jubail Chevron expansion Project.
December 2010

Sapin

  • Supply arrangement for chiller
January 2011

AMO & Partners Co.

  • Supply arrangement for construction machinery & Cranes.
January 2011

Welspun Middle East

  • Electrical works for expansion of the factory
January 2011

Al-Khifa

  • Electrical works for 12 stories building.
Febuary 2011

 


 

Client

Description of Work

Completions Date

Al-Mouwasat Hospital

  • Construction of substation.
March 2011

Sapin

  • Supply arrangement for New Metal Print Machine.
March 2011

ICDOC

  • Construction of M.V. Substation & Customer side electrical room.
March 2011

Sinnemar PMCD

  • Electrical works for Villas
March 2011

Colgate Palmolive

  • Electrical expansion works.
April 2011

NPC

  • Supply arrangement for New Japan Machinery.
April 2011

Jal International

  • Construction of Sub-station & Installation of MDB
May 2011

EIC

  • Power up gradation work for new Machine
May 2011

Sigma Paint

  • Construction of Substation.
May 2011

EIC

  • Power up gradation work for new Machine
May 2011

Zahoor Al-Reef

  • Construction of Substation & Electrical expansion work
June 2011

Al-Dowly

  • Construction of Sub-station & Customer Room
June 2011

Al-Qadi

  • Complete Electrical works for new office & Accommodation Buildings.
August 2011

Al-Kifah Contracting

  • Complete Electrical works for Residential Building at Royal Commission, Jubail
August 2011

King Faisal University

  • Supply, Installation & Termination works for 2000 KVA Package Unit Sub-station
October 2011

 

Client

Description of Work

Completions Date

National Pipe Company (NPC)

  • National Pipe Company (NPC)
November 2011

I.V.M

  • Electrical work for their new Machinery.
December 2011

Al-Grainish Cold Store

  • Complete Electrical works for their new Cold Store
December 2011

National Pipe Company (NPC)

  • Electrical & Utility works for new Laboratory
December 2011

Al-Kifah Contracting

  • Complete Site preparation, Electrical works for Royal Commission Project.
December 2011

Dowly Sports city

  • External Medium voltage work and Termination of all Panels
Janaury 2012

Mobily Tower Dammam

  • Cable laying and termination of cables for LV Panels
Febraury 2012

Prainsa

  • Medium voltage and Low Voltage complete Electrification work for Al Rushid Compound.
March 2012

Flowserve

  • Supply and installation of soft starter panel for 480v,400HP motor testing facility.
March 2012

King fahd university of petroleum and minerals.

  • Construction substation room and installation of 500A breaker Panel.
March 2012

King faisal university Al Hassa

  • Replacement of 2000A breaker in package substation
March 2012

Saudi Master Baker company

  • Electrical up gradation works for their new unit at second industrial city
May 2012

Global Pipe company

  • Complete Medium voltage, Low voltage and all electrical works for their new factory at Jubail under Royal commission.
May 2012
Our website is protected by DMC Firewall!